To support planning and engineering design, Challenger provided a topographic site survey of the downtown of Lac La Biche.
This project involves the use of existing City of Edmonton remote sensing and landscape feature datasets to analyze the canopy cover of Edmonton’s urban forest.
Challenger provided survey support for the development of a new solar array in Old Crow, Yukon. The project is anticipated to displace 190,000 litres of diesel fuel every year.
Anchoring the Edmonton Brewery District is the century-old Molson Brewery. To support project planning and design, Challenger completed a full scan of the building interior and exterior.
The second of two sternwheelers bearing the name, the S.S. Klondike carried freight between Whitehorse and Dawson City along the Yukon River from 1937 to the early 1950’s. In 1967, it was designated a National Historic Site of Canada and moved to its current location along the banks of the Yukon River. Challenger scanned the vessel interior and exterior to support Parks Canada’s ongoing preservation and restoration work.
Covering 3300 acres of land and eventually producing 465 MW of electricity, the Travers Solar Project is the largest solar farm to date in Canada. Construction requires the precise layout of 228,000 piles.
The Saddlebrook Solar Project will consist of a solar generating facility along with a battery energy storage system.
Challenger provided road plans to Brazeau County to support the construction of various roads as well as services in support of the closure of an undeveloped government road allowance.
The West Calgary Ring Road Project, running between Highway 8 and the Trans-Canada Highway, is the final phase of the Calgary Ring Road. Challenger provided construction survey services for grading, paving, and bridge construction.
Challenger has provided ongoing survey services for control monitoring of the building and surrounding area. Challenger also provided a detailed topographic survey of the site to support engineering design and measures to mitigate building and site movement.
Challenger provided survey support for the design and construction of the new DRU site, rail terminal, pipe racks, and pipelines.
Challenger provided mapping and construction survey support to our client in the development of new transportation infrastructure and storage capacity