Engineering survey from Mile 80 to Mile 100 (32km in length) along the CN Edson Subdivision to allow for the development of an additional track along the south side of the existing mainline.
Services Delivered
Locate and survey all visible utilities
Surveys to tie in to the edges of all permanent water bodies
Cross section at all culverts under roadways or railways including inverts and all roads within Right-of-Way limits
Topographic survey of all rail features
Establishment of primary and secondary survey control
Survey cross sections of embankments from the toe of ballast including the edge of tie and rail
Base plan showing all topographic features tied in, including surface file, and the plan showing the location of adjusted control lines