High River Flood Mitigation

Tervita

Project Summary

After the 2013 flood, the town dike, west town dike, NW dikes, golf course dike, and Lineham Canal dike were all constructed to provide protection from future flooding. Challenger provided survey services and support for the design and construction of these critical flood mitigation works in High River.

Services Delivered

  • Original ground surveys
  • Alignment and construction stakeout
  • Volume calculations
  • QA/QC to ensure flood mitigation works met design levels
  • As-builts
High River Flood Mitigation

Client: Tervita

Location: High River

Request A Quote