High River Flood Mitigation

Tervita

After the 2013 flood, the town dike, west town dike, NW dikes, golf course dike, and Lineham Canal dike were all constructed to provide protection from future flooding. Challenger provided survey services and support for the design and construction of these critical flood mitigation works in High River.

Services Delivered

  • Original ground surveys
  • Alignment and construction stakeout
  • Volume calculations
  • QA/QC to ensure flood mitigation works met design levels
  • As-builts
High River Flood Mitigation

Client: Tervita

Location: High River

Request a Quote

Tell us a little more about your project (location details, services required, etc.) and we will follow up with you to provide pricing and answer any questions.

Request a Quote